Choosing to lay tile on a concrete slab is a good idea.
Do you have to seal a concrete floor before tiling.
Step 3 mix.
Use reputable flexible adhesive for tiling on screeds and concrete and as per the manufacturers specifications do not use pva but a latex based primer if the concrete surface is shedding dusty fine particles after drying.
Cement on top of slab is solid and not flaky i dont worry about it i like the glue to be absorb into the slab but if u seal could not absorb u dammed if u dont and dammed if u do been tiling 29 years.
You will have to clean and prepare the concrete surface before installing any tile.
To prevent that movement from creating cracks in your grout and tile install a crack prevention membrane after the concrete subfloor is clean flat and free of cracks larger than 1 8 inch.
A concrete slab makes a good surface on which to lay tile.
Dirt plaster adhesive and all manners of stuff will be ground into it before the tiler gets round to tiling it.
New concrete floors or screeded floors are a different matter.
So your nice new clean ply floor isn t so clean anymore and if it s not prepared properly prior to tiling the adhesive will just go onto the dirt on the floor and might not stick.
If you re unsure about yours remove a tile and send it to a local asbestos abatement firm for testing.
For that reason it is best to use an elastomeric crack prevention membrane to both seal the floor and protect your tile installation from failure.
The following steps will allow you to prepare a concrete floor before you lay your tiles.
Warning never lay tile over a damaged concrete floor without repairing it or your.
Lay down a sheet of crack isolation membrane before tiling if your concrete floor is severely damaged or aged.
You can either roll on a liquid latex membrane or use a peel and stick crack prevention mat over the entire concrete subfloor.
Also ensure that the concrete is level.
Cleaning and filling any cracks in the floor takes a little time and the only precautions to take prior to tiling are to make sure that the floor is completely dry as the thinset used for tile needs a moisture free environment.
Use filler to fill in any dips and apply a floor leveler for any humps in the floor.
If it tests positive follow these asbestos abatement procedures.
This is why it is better to prime it than not to.
Jul 5 2010 1.
Deciding whether to seal the concrete is part of the preparation.
These membranes prevent water from seeping up.
Priming new concrete floors.
Most floor tiles made from the 1920s to the 1960s contain asbestos and require special procedures for removal.
Dont forget to seal the floor with pva before applying any tile adhesive and use a good quality adhesive for your.
Seal off the area with poly sheeting.