Where h is height of water.
Double wall sheet pile cofferdam.
The space between the walls is generally filled with granular material such as sand gravel or broken rock.
Double walled cofferdam is provided in such situations.
Double wall sheet piles this type of cofferdam is suitable when it is required to exclude water over 36 feet.
A double wall sheet piling cofferdam comprises two straight parallel vertical walls of sheet piling tied to each other.
The gap between the two rows of steel sheet piles is generally filled with granular material such as gravel or gravel.
This type of cofferdam can be used in depth of water up to 12 m.
The width between the parallel piles is h 2 1 50 m.
Its construction is essentially the same as that of a single walled cofferdam except that in place of one wall a pair of walls with a gap in between is used all along the boundary of the space to be enclosed.
Double wall sheet pile cofferdam higher than 7 5 feet should be strutted.
Double wall sheet piling cofferdam these dam consists of two straight parallel vertical walls of sheet piling tied to each other and the space between walls filled with soil.
The gap between walls is filled with soil.
This consists of two straight parallel vertical wall of sheet piling tied to each other and the space between them filled with soil.
This type of cofferdams if higher than 2 5 m should be strutted.
Double walled sheet pile cofferdams.