Measure across the diagonals of the 2 x 4 opening.
Drop ceiling grid installation instructions.
Join sections of main beam.
Be sure the suspension wires are securely fastened.
Use a chalk line or tie strings across your room every 4 ft 1 2 m.
The main runners will support the.
Additional 2 cross tees dotted lines are installed parallel to the main tees 2 o c.
Suspended ceiling for 2 x 4 ceiling panels.
A b step install panels 3 2 x 2 installation 1.
Quickhang instructions are notated by a gray background.
Determine the size of your border panels from side to side.
Secure the end of a chalk line on one end of.
Once you ve figured out the size of the border row measure back from the cross tee slots and cut your main tees to size.
Putting in the grid system 1.
The measurements will be the same if the grid is square.
Cut the main tees for the drop ceiling hangers.
To allow for ceiling tile installation and accessibility the minimum drop is 3 with traditional hanger wire or 2 5 with quickhang grid hooks.
Check the original sketch of the room to determine this location.
Three easy steps to install your ceiling 1.
Snap the chalk line tool to create this.
If the grid is not square shorten one of the main beams until the diagonals are equal.
The cross tee slots must line up.
Install two four foot cross tees between the two main beams in line with the first two border cross tees.
Apply them to the ceiling with screw eyes screw hooks nails or by drilling.
Screw an eyelet into every.
Install hanger wire or.
300mm 45 0 45 0 300mm 1 80mtr.
Drop into place a.
If you are using 2 x 2 panels you need to lay out your grid differently.
Lift panel at angle through grid.
Installing 2 x 4 drop ceiling panels determine the size of the border panels to get the length of your border panels divide the width of the room by the.
Cut the main runners to fit the length of your room perpendicular to the joists.
Trim border panels cutting panel face side up b.
Don t assume the wall is straight.
Locate the first suspension wire for each main tee directly above the point where the first cross tee meets the main tee.
Literally measure and make a to scale drawing of each room.
Install wall molding mark the desired new ceiling height on the wall.
Measure and cut the main tees according to a cross tee guideline.
Step 1 design your drop ceiling grid it starts with a game plan.
Then layout your tile spacing and see how it looks.
Installation of hangers ceiling soffit duct section threaded rod hanger wire vertical support slotted bar main tee for suspending the ceiling.